Skip to content
+1 734-761-8989

Reduce unplanned downtime

September 11, 2025

Boost Efficiency and Cut Costs with Real Time Z-Tracking in the Body Shop

Unplanned downtime is one of the biggest cost drivers in automotive manufacturing. For one of the world’s largest OEMs, adhesive nozzle breakage caused by sheet-metal variation was creating a major challenge—each incident resulted in: 30+...

July 8, 2025

Eliminate Guesswork in Dispensing: Join the Coherix TDSE Workshop on July 24

For manufacturing engineers working with precision dispensing systems, one thing is clear: production errors are expensive and guesswork only makes them worse. That’s why Coherix is hosting its upcoming TDSE (Total Dispensing System Engineering)...